fyi
Joined: Thu, Aug 9 2012, 9:19 am EDT Posts: 889
|
Posted: Thu, Jan 30 2014, 10:09 am EST Post subject: BRAINERD LAKE DAM PROJECT UPDATE |
|
|
BRAINERD LAKE DAM PROJECT UPDATE
January 29, 2014
The concrete curb wall was poured and the fill area between the sheet piling and curb wall was poured. The spillway area was excavated for the proposed foundation. Concrete construction barriers were installed on the east side of the road. |
|